RESTORATION
The ICC Traffic Topping System
PARKING GARAGE
Parking Garage Restoration
Laneways, Parking Stalls, Turning Radai, Ramps
Parking Garage Restoration
Laneways, Parking Stalls, Turning Radai, Ramps
The Parking Garage System developed by ICC consists of various stages including concrete restoration, expansion joint installation, plumbing, concrete testing, line painting, and waterproofing, which are all crucial to the preparation of garage flooring. This system utilizes most of the elements of ICC’s suspended slab waterproofing system.
ICC’s Green Flooring Solution is an eco-friendly coating system that incorporates up to 75% recycled materials and 100% post-consumer aggregates. This solution has the added advantage of being odourless and having low VOCs.
The Parking Garage System developed by ICC consists of various stages including:
concrete restoration
expansion joint installation
plumbing
concrete testing
line painting
waterproofing
All are crucial to the preparation of garage flooring.
ICC’s Green Flooring Solution is an eco-friendly coating system that utilizes most of the elements of ICC’s suspended slab waterproofing system.
Parking Garage Installations
Parking GarageTraffic-Topping System
Remove this critical responsibility from your Management Team
Engineered systems as per consultant specifications (ICC PG Spec Package)
20-year warranty and maintenance program
Real-Time, OnlinePortal Access
Project scheduling management
Project Progress / Milestones
Future works budget forecasting
Provides direction and installation details at each stage of the project for your Architect, Engineer, and Operations Manager