Green Floor Garage
ICC was assigned the rehabilitation of a 240,000 sq. ft., 3-level parking garage in a Toronto inner neighbourhood.Downtown highrise
The mechanical room located on the 25th floor of a prestigious downtown high-rise in Toronto now has a successfully installed suspended slab waterproofing system, thanks to ICC.